Placement Guide

NEC Solar Label Placement Guide

Solar Label Placement Guide

Learn where to place solar warning labels, PV labels, and photovoltaic placards for DC string systems, microinverter systems, and older NEC versions. This guide helps contractors and installers understand required label locations and quickly find matching part numbers.

DC String Systems Microinverter Systems NEC Reference Versions Linked Label Part Numbers

Where Solar Labels Need to Be Placed

Solar labels are commonly required at disconnects, inverters, service equipment, combiner boxes, rapid shutdown switches, meter locations, point of interconnection, and other key system components. Proper placement helps support NEC compliance, improve safety, and reduce inspection delays.

Below you’ll find placement diagrams and matching label references for different NEC versions and common PV system layouts.

2026 NEC Placement Guide (05-526)

Coming Soon

The 2026 NEC solar placement guide is in development. In the meantime, use the 2023 guides below for current reference.

2023 DC String System Placement Guide (05-523)

Placement guide for traditional DC string inverter solar systems.

View 2023 NEC Assortment Pack
2023 NEC DC String Solar Label Placement Guide

Common Labels Used in 2023 DC String Systems

Part # Description
02-316 Rapid Shutdown Switch for Solar PV System
03-303 Maximum DC Voltage of PV System Disconnect (Write-In)
03-306 AC Disconnect Photovoltaic System Power Source (Write-In)
03-308 Voltage Rating Label with Write-In Electrical Values
03-313 Solar PV DC Circuit
03-315 Photovoltaic Power Source
05-108 Warning - Equipment Fed by Multiple Sources
05-112 Solar PV System Equipped with Rapid Shutdown
05-208 Direct Current Photovoltaic Power Source (Write-In)
05-215 Warning - Electric Shock Hazard
05-216 Warning - Power Source Output Connection - Do Not Relocate This Overcurrent Device
05-219 AC Junction Box Warning / Caution Solar Circuit
05-232 DC Junction Box Warning Electric Shock Hazard
05-233 DC Combiner Box Label with Write-In
05-234 Warning - Maximum DC Voltage of PV System (Write-In)
05-235 Solar Inverter Warning with Write-In
05-323 AC Disconnect
05-326 Warning - Do Not Disconnect Under Load
05-330 Caution Solar Circuit
05-341 PV System kWh Meter
05-342 Warning - Solar Electric Circuit Breaker Is Backfed
05-343 Photovoltaic Solar Breaker
05-345 Do Not Relocate This Overcurrent Device
05-346 Warning - DC Conductors of This Photovoltaic System Are Ungrounded and May Be Energized
05-347 Warning - Photovoltaic Power Source
05-355 Warning - Photovoltaic System Combiner Panel - Do Not Add Loads
05-411 Warning - Dual Power Supply Sources Utility Grid and PV Solar Electric System

2023 Microinverter Placement Guide (05-524)

Placement guide for microinverter-based solar systems.

View 2023 Microinverter Assortment Pack
2023 NEC Microinverter Solar Label Placement Guide

Common Labels Used in 2023 Microinverter Systems

Part # Description
02-316 Rapid Shutdown Switch for Solar PV System
03-220 Caution AC Solar Voltage
03-306 AC Disconnect Photovoltaic System Power Source (Write-In)
03-315 Photovoltaic Power Source
05-108 Warning - Equipment Fed by Multiple Sources
05-112 Solar PV System Equipped with Rapid Shutdown
05-215 Warning - Electric Shock Hazard
05-216 Warning - Power Source Output Connection - Do Not Relocate This Overcurrent Device
05-219 AC Junction Box Warning / Caution Solar Circuit
05-307 Caution Multiple Sources of Power
05-323 AC Disconnect
05-326 Warning - Do Not Disconnect Under Load
05-330 Caution Solar Circuit
05-341 PV System kWh Meter
05-342 Warning - Solar Electric Circuit Breaker Is Backfed
05-343 Photovoltaic Solar Breaker
05-345 Do Not Relocate This Overcurrent Device
05-347 Warning - Photovoltaic Power Source
05-355 Warning - Photovoltaic System Combiner Panel - Do Not Add Loads
05-411 Warning - Dual Power Supply Sources Utility Grid and PV Solar Electric System

Legacy NEC Placement Guides

Need an older NEC reference? These legacy placement guides are still useful for past project standards, service updates, and historical comparison.

2020 NEC Guide

DC string and microinverter placement guide with assortment pack links.

2017 NEC Guide

Placement diagrams and assortment pack references for 2017 NEC systems.

2014 NEC Guide

Older DC string and microinverter placement references for legacy projects.

2011 NEC Guide

Historical PV label placement reference for older installation standards.

2020 NEC Placement Guide Images

2020 NEC DC Strings Placement Guide
2020 NEC Microinverters Placement Guide

2017 NEC Placement Guide Images

2017 NEC DC Strings Placement Guide
2017 NEC Microinverters Placement Guide

2014 NEC Placement Guide Images

2014 NEC DC Strings Placement Guide
2014 NEC Microinverters Placement Guide

2011 NEC Placement Guide Images

2011 NEC DC Strings Placement Guide
2011 NEC Microinverter Placement Guide

Frequently Asked Questions

Where do solar labels need to be placed?

Solar labels are commonly placed on inverters, disconnects, rapid shutdown switches, combiner boxes, service equipment, meter locations, and other key PV system components.

Do placement requirements change by NEC version?

Yes. Placement requirements and exact labeling language can change between NEC versions. This page provides reference images and linked assortment packs for multiple code cycles.

What if I need help finding the right labels?

If you are unsure which labels your project needs, visit our support page or browse our solar labels category for additional guidance.

Need Solar Labels for Your Installation?

Shop NEC-compliant solar labels, placards, and assortment packs built for contractors and installers.